Cost to build a house calculator

Your house, costed.

Every phase from the permit to the mailbox, priced from your square footage with materials and labor shown apart. Flip a phase to do it yourself and the number moves. Change the state and the index moves it again. Attach your plans and the same ledger is measured from your drawings.

Permit and plan review, survey, tap or impact fees, builder’s risk, plans

$12,100
Paid, not built

Clearing, rough grade, driveway base, erosion control, temporary power

$16,000

Monolithic slab with turned-down footings, mesh, vapor barrier, gravel

$24,400

Walls, floor and roof framing, sheathing, house wrap, headers

$41,200
Exterior wall studs, 2 × 6, 243 studs104⅝ in precut, 16 in on center, 243 lf of wall$1,700
Partition studs, 2 × 4, 500 studs104⅝ in precut, 16 in on center, 500 lf of wall$2,200
Plate stock, 2 × 6 × 16 ft, 48 boardsSingle bottom, doubled top, 5% cut waste$800
Plate stock, 2 × 4 × 16 ft, 99 boardsSingle bottom, doubled top, 5% cut waste$1,100
Header stock, 2 × 10 × 8 ft, 31 boardsOne doubled header per opening: 18 windows, 3 exterior doors, 10 interior doors$400
Garage door header, LVL, 1 each16-ft opening$200
Wall sheathing, 7/16 in OSB, 76 sheets2,183 sq ft of exterior wall, 10% waste$1,700
House wrap, 3 rolls10 × 100 ft rolls, tape included$600
Roof trusses, 40 trusses6:12, about 39 ft span, 2 ft on center, hip and jack sets$5,600
Roof sheathing, 7/16 in OSB, 107 sheets3,091 sq ft of roof deck, 10% waste$2,400
Porch posts, 6 × 6 PT, 4 posts$300
Porch beam and roof framing$400
Blocking, backing, treated plates, sub-fascia6% of the lumber above: fire blocking, drywall backing, PT bottom plates on the slab, gable and eave framing$1,000
Nails, hangers, strapping, bracing8% of the lumber above: framing nails, hurricane ties, let-in bracing, temporary bracing$1,400
Materials$19,600
Labor, about 480 hours$21,600

Architectural shingles, underlayment, ice and water, flashing, ridge vent

$12,900

18 windows, 3 exterior doors, garage door

$19,400

Siding, trim, soffit and fascia, gutters

$20,800

2.5 baths, kitchen, laundry; rough-in and finish

Some states reserve this work for a licensed trade. Check your state guide.

$21,800

200A service, rough-in, devices, fixtures, smoke detectors

Some states reserve this work for a licensed trade. Check your state guide.

$20,600

3.5-ton heat pump, ductwork, thermostat, bath fans

Some states reserve this work for a licensed trade. Check your state guide.

$18,700

Wall batts, blown attic, air sealing

$4,900plus about 60 hours of yours

Hang, finish, prime, two coats throughout

$25,600

Doors, trim, flooring, cabinets, countertops, tile, bath accessories

$36,100plus about 440 hours of yours

Appliances, landscaping, concrete driveway and walks, cleanup

$13,700plus about 110 hours of yours
Cash to build$288,300

Quantities are derived from your square footage and a typical footprint; the sheet below the ledger says how. Prices are national ranges for October 2026, scaled to North Carolina. An estimate, not a quote; order after a takeoff from your plans.

Methodology

How the ledger is figured

SHEET W-02

Everything starts from one division: finished square footage ÷ stories = footprint. The footprint is treated as a 1.5:1 rectangle for wall lengths, openings and rooms are counted by density rules, and the roof is drawn over the footprint, the garage, and the porch. Those few derived numbers feed every phase, each of which prices a short list of real line items at national rates as of October 2026, scaled by the state you pick. Open any row on the ledger to see its lines; the defaults below are for the 2,000 sq ft house.

Before you break ground. The building permit is a state base plus $0.35 per heated square foot, with plan review, the survey, the water and sewer tap or impact fees (the state table carries the band), twelve months of builder's risk insurance at half a percent of the hard cost, and the plans. Paid, not built, so there is no labor switch.

Site work. Fill and topsoil, a 100-ft gravel drive at 8 in deep, silt fence around the disturbed area, a stone construction entrance, and a temporary power pole. Clearing and grading are equipment and labor, which is why this phase carries the highest labor ratio on the ledger.

Foundation. A slab is 4 in over the house and garage with a 20 × 12 in turned-down footing, mesh, rebar in the footing, a vapor barrier, and 4 in of gravel (49 yd³ in the default house, with a 10% order factor). A crawl space swaps that for a continuous footing, a 3-ft block stem wall, piers every 200 sq ft, a treated sill, and vents, and the first floor becomes framed. A basement is 8-ft poured walls on footings with a slab, waterproofing, and drain tile. The concrete slab calculator prices a pour from your actual dimensions.

Framing. The same conventions as the framing lumber calculator: one stud per linear foot of wall at 16 in on center, three runs of plate in 16-ft sticks, a doubled header per opening, 4 × 8 OSB with 10% waste, house wrap, then joists and subfloor for any framed floor, trusses at 2 ft on center over the plan area, roof sheathing, porch posts, and allowances for blocking and fasteners. The default house takes 243 exterior studs, 500 partition studs, and 40 trusses.

Roofing. Sloped area is the plan area times the pitch factor (6:12 by default), with 10, 15, or 20% waste by how cut up the roof is; three bundles per square (107 in the default house), synthetic underlayment, ice and water on the eaves, starter, cap, drip edge, ridge vent, flashing, and nails, as the roofing calculator counts them.

Windows and exterior doors. One window per 110 sq ft at 15 sq ft each, an entry door with sidelights, a patio door, a back door, and a 16-ft garage door with its opener when the house is large enough to carry a garage. Finish level moves these: basic is 0.85× the standard rate, premium 1.3×.

Exterior finish. Fiber-cement lap siding on the wall area after openings with 10% waste, trim at corners, openings, and the band, soffit and fascia on the eaves and rakes, aluminum gutters with four downspouts, and a caulk-and-flashing allowance. Finish-sensitive.

Plumbing, electrical, HVAC. Plumbing is priced per fixture for the rough-in (three per bath, two in the kitchen, two in the laundry, two hose bibs) plus the service lines, water heater, and finish fixtures. Electrical is a 200-amp service, wire and boxes per heated square foot, devices and a fixture allowance per room, and detectors. HVAC is a heat pump at one ton per 600 sq ft, moved by the state's climate, with ductwork per square foot, a thermostat, and bath fans. These three carry a licensed-trade note because many states require one.

Insulation, drywall, paint. R-19 batts in the walls and blown fiberglass to R-49 in the attic by the insulation calculator's bag charts, with floor batts under a crawl space or rigid foam on basement walls. Board is the drywall calculator's 3.7 × floor area (270 sheets in the default house) with compound, tape, screws, and corner bead; paint is the paint calculator's primer plus two coats at 350 sq ft per gallon, with trim enamel per room.

Interior finish and final. Interior doors are rooms minus two; baseboard runs the finished wall perimeter; flooring is the heated area with 8% waste at a blended plank, tile, and carpet rate (the flooring calculator does it by room); cabinets, vanities, countertops, bath tile, shower glass, and accessories are counted by kitchen and bath. The final phase is the appliance package, 870 sq ft of concrete drive and walks, seed and shrubs, the last clean, three dumpsters, and the odds and ends.

Labor and the state index. Each phase's labor is its material cost times a ratio calibrated to 2026 subcontractor quotes (framing 1.1, drywall and paint 1.9, electrical 1.5, openings 0.3), then the state's labor index. Hours are that figure at a blended crew rate of $45 an hour ($65 for the licensed trades). The materials index is narrow, since lumber and concrete travel; the labor index is wide, since crews do not. North Carolina is 1.00. The permit base and tap fees are set per state and are not scaled again.

Assumptions

What the default house assumes

CHANGE THE CHIPS

  • FootprintFootprint of 2,000 sq ft (heated area ÷ one story), as a 1.5:1 rectangle about 55 by 37 ft.
  • Walls9-ft walls; interior partitions at 1 linear foot per 4 sq ft of floor (500 lf).
  • Openings18 windows at 15 sq ft each (one per 110 sq ft), 3 exterior doors, a two-car garage with one 16-ft door.
  • Rooms12 rooms, 2.5 baths, 3 bedrooms, one kitchen, one laundry.
  • RoofHip or mixed roof at 6:12 with 1-ft overhangs, trussed.
  • FoundationMonolithic slab with turned-down footings under the house and garage.
  • PorchOne front porch, 120 sq ft, on four posts.
  • Finish multiplierBasic 0.85×, standard 1×, premium 1.3× on openings, exterior, drywall and paint, interior
  • Labor ratiosSite 1.5, foundation 0.9, framing 1.1, roofing 0.9, plumbing 1.3, electrical 1.5, HVAC 0.7, drywall and paint 1.9, interior 0.55, final 0.35
  • Contingency10% of cash to build, shown apart
  • PricesNational ranges, October 2026; the ledger prints the middle of each range

Scope

What this estimate leaves out

The land, the loan, and the furniture. The ledger also assumes a buildable lot with utilities at the street and a typical footprint; a well and septic, a long power run, rock, extra fill, a retaining wall, or an unusual shape are on top. Track what you actually spend against the phases in the budget tracker, and carry the contingency.

Field notes

Ordering materials without losing money

Order 10–15% extra on anything you cut. Waste, mistakes, and future repairs all come out of the same pile. It matters most for materials that get discontinued — flooring, tile, siding — where a matching board three years from now is worth more than the storage space it took.

Open contractor accounts. Set up accounts at real lumberyards and suppliers rather than buying retail. Better pricing (usually 10–20% off), delivery scheduling, and access to contractor-grade material that the big boxes do not stock. This is the largest discount available to an owner-builder for the least effort.

Time orders to the schedule, not the budget. Bring material in 1–2 weeks before you need it. Buying everything up front invites theft, weather damage, and ties up cash you will want later. The exception is lumber: if the market is low and you have dry covered storage, locking a price in is defensible. Sequence your orders against your build timeline and the framing phase in particular, since that is where the biggest single delivery lands.

Inspect every delivery before you sign. Count it, look for damage, check that it is what you ordered. Getting credit after the driver pulls away is a different and much worse conversation.

Store it like it cost you money. Wet lumber warps, wet drywall is scrap, and moisture-damaged material causes problems that surface a year later. Tarps on, material up off the dirt, stacked flat.

Keep every receipt. Track each purchase against the phase it belongs to. You will need it for budget tracking, for warranty claims, and occasionally for an inspector who wants to see a product spec.

Questions

Owner-builders ask

FAQ

How much does it cost to build a 2,000 sq ft house?

With every trade hired, this calculator puts a 2,000 sq ft one-story house on a slab with standard finishes in North Carolina at about $316,000, or $158 a square foot, with a likely range of $239,000 to $392,000. That is cash to build: materials, hired labor, and the soft costs before you break ground, without the land, the loan, or a contingency. Do the insulation, interior finish, and final phase yourself, as the ledger starts out, and cash drops to about $288,000 for roughly 610 hours of your own work. Change the state and the index moves every line.

How much of the cost of building a house is labor?

About 44% in the default house: $140,000 of $316,000 is hired labor, $164,000 is materials, and $12,000 is permits, fees, insurance, and plans. That split is the whole case for owner-building. You cannot talk a lumberyard down by half, but you can replace a crew with your own hours on the phases you are able to do, and the ledger shows what each one is worth. Framing alone is about $41,000 hired, or 480 hours of yours.

Which phases can I do myself?

Anything the ledger lets you flip, with two cautions. Plumbing, electrical, and HVAC are licensed trades in many states, and some require a licensed contractor to pull the permit even on a house you own; those three rows carry a note, and your state guide has the rule. And framing, roofing, and drywall are hard, fast work on a schedule, so price your own hours honestly: the ledger converts each phase to hours at a crew rate, and a first-timer takes longer than the crew.

What does the $20 measured estimate buy?

The same fourteen-phase ledger, measured from your drawings instead of derived from your square footage. Attach the plan set as one PDF, answer three questions the drawings rarely settle (foundation, floor framing, roof framing), and pay $20. StudTally reads the set, usually within a few hours, and this page re-draws itself from the footprint, every wall, window and door, the roof as drawn, and the rooms, with the sheet each number came from beside it. Phases the plans cannot settle (site work, electrical, HVAC, the final phase) stay derived from the measured size and are tagged that way. The results link is emailed to you and keeps working; if the set cannot be read, the $20 is refunded automatically.

What does the $79 at StudTally buy?

The framing list only. StudTally reads your plan set and returns every stud, plate, header, sheet, and hanger, counted per wall and reviewed by a person, as the list the lumberyard keys in. It does not price the other thirteen phases; those stay estimates from this page. Use it when you are ready to order framing, not to budget the house. If you paid for the measured estimate here, the $20 comes off the $79 with the code on your results page.

How big can the plan PDF be?

100 MB and 40 sheets, here and at StudTally. A full set from an architect is usually well under that; if yours is not, export the PDF at a lower raster resolution or send only the architectural sheets (plans, elevations, sections, schedules), which are the ones that get read.

Why is my quote different from this estimate?

Three reasons, in order of size. Prices move: lumber swings 50 to 100% with the market, so a quote from a different quarter is a different number. Your lot is not the typical one: rock, a steep grade, a long drive, or a well and septic in place of a tap fee each move a phase by thousands. And a contractor account at a real lumberyard beats big-box retail by 10 to 20%, the easiest discount an owner-builder can pick up. Use the ledger to size the budget and sanity-check quotes, not to replace them.

How accurate is a square-footage estimate?

Close enough to budget with, not close enough to order from. The ledger derives a footprint, walls, openings, and a roof from your square footage by the rules stated below, so an unusual shape, a walk-out basement, or a lot of glass will move the numbers. Once you have plans, the trade sheets (framing lumber, concrete, drywall, roofing, flooring, insulation) take real dimensions and give you order quantities, and StudTally reads the plan set itself for the framing list.

What does this estimate leave out?

The land and everything about buying it, the construction loan and its interest, and the furniture. It also assumes a buildable lot with utilities at the street: a well and septic, a long power run, rock, or fill beyond the allowance are on top. Carry the 10% contingency the rail shows; every build finds something.